What to Expect During Your Roof Installation: Complete Homeowner Guide
Fullstack Team
Utah Roofing Experts
Your first roof replacement can feel overwhelming. There's a crew of people on your roof, materials everywhere, noise that shakes the whole house. If you don't know what's happening, it's easy to feel stressed.
I've seen homeowners pace around their yards looking worried when everything is actually going perfectly fine. They just didn't know what to expect.
So let me walk you through exactly what happens during a roof installation—from the day before we show up until we drive away with your new roof complete. Knowing the process helps you feel in control, even when there's chaos above your head.
Key Takeaways
- Materials typically delivered 1-2 days before installation
- Move vehicles, patio furniture, and delicate items before work starts
- Take down hanging pictures inside—vibration can knock them off walls
- Cover attic items near the roof deck with plastic
- We'll confirm timing the evening before based on weather
The Day Before: Preparation and Final Details
The work actually starts before we arrive. Here's what happens and what you should do:
Material Delivery: We typically have materials delivered a day or two before installation. Shingle bundles are heavy—a full load for an average roof is several tons. Having materials on-site means we can start working immediately when we arrive.
Your Prep Work: This is the time to handle everything we discussed during the consultation:
- Move vehicles out of the driveway and away from the house
- Clear decks and patios of furniture, grills, and decorations
- Move hanging pictures inside—the vibration can knock things off walls
- Cover items in your attic with plastic if they're near the roof deck
- Arrange pet care or confine anxious pets to interior rooms
- Let neighbors know about the upcoming work (a courtesy that prevents complaints)
Weather Check: We monitor the forecast closely. If significant rain is expected, we might delay a day rather than risk getting caught mid-tear-off. We'll call you the evening before to confirm the start time.
If everything looks good, we'll confirm an early morning start—usually 7:00 or 8:00 AM. We start early to maximize daylight hours and often beat the summer heat.
Morning: Setup and Tear-Off
This is when things get loud and busy. Here's what's happening:
7:00-8:00 AM - Crew Arrives: A typical crew is 4-6 workers depending on roof size. We set up ladders, safety equipment, and material staging areas. You'll see a trailer or dump truck parked for debris.
8:00-12:00 PM - Tear-Off: This is the noisiest part. We're literally ripping the old roof off your house. Shingles, underlayment, and debris come down into the trailer or into a controlled drop zone. It sounds chaotic, but there's a system.
During tear-off, we're also inspecting the deck. As each section is exposed, we're looking for water damage, rot, soft spots, or structural issues. If we find problems, we'll document them and let you know immediately.
What You'll Experience:
- Significant noise—think heavy thumping and scraping
- Vibration you can feel inside the house
- Dust and debris around the house exterior
- Workers walking on your roof constantly
This is not a time to be home doing quiet work. If you can, leave for the morning. Run errands, go to a coffee shop, take the kids somewhere. The morning tear-off is intense.
By late morning or early afternoon, the old roof is usually completely off and we're looking at bare decking. At this point, we'll update you on deck condition and any repairs needed.

Afternoon: Repairs and New Roof Installation
Once tear-off is complete, the pace shifts from demolition to construction:
Deck Repairs: If we found damaged decking, we repair it now. Minor repairs take an hour or less. More extensive damage takes longer but we handle it all before proceeding.
Ice and Water Shield: In Utah, we apply ice and water shield along eaves and in valleys. This self-sealing membrane protects against ice dams and wind-driven rain. It's one of the most important layers in your roof system.
Underlayment: Synthetic underlayment goes over the entire deck. This is your secondary water barrier if shingles ever fail. We use quality synthetic underlayment, not the old felt paper that deteriorates quickly.
Drip Edge and Flashing: Metal drip edge is installed around all roof edges. Flashing goes around chimneys, vents, walls, and other penetrations. Proper flashing is critical—this is where most roof leaks originate when done poorly.
Shingle Installation: Finally, the shingles go on. We work from the bottom up, with each row overlapping the one below. Proper nailing pattern and placement matter for wind resistance and warranty compliance.
By the end of day one on a typical roof, we've got most or all of the shingles installed. The roof is water-tight, even if we're not completely finished.
- Deck repairs completed before new roofing is installed
- Ice and water shield applied at eaves and valleys
- Synthetic underlayment covers entire deck
- Drip edge and flashing installed at all edges and penetrations
- Shingles installed from bottom up with proper overlap
Final Day: Completion and Cleanup
If your roof took more than one day, the final day is typically shorter:
Morning - Finish Installation: We complete any remaining shingle installation, install ridge cap along the peak, and add ridge vents for attic ventilation. Finishing touches include caulking around flashing and checking every detail.
Final Inspection: Before anything comes down, our crew leader does a thorough walk-through of the entire roof. We're checking for proper installation, alignment, nailing, flashing seals—everything. We don't leave problems behind.
Cleanup: This is important. We don't just throw shingles in a truck and leave. Here's what proper cleanup looks like:
- All debris removed from roof, gutters, and ground
- Magnetic sweeps of entire property to catch nails
- Landscaping beds inspected and cleaned
- Driveway and sidewalks swept
- Property inspected from street to ensure nothing was missed
We do multiple magnetic sweeps because nails are inevitable. No one wants a flat tire from their roof job. We take this seriously.
Walkthrough With You: Once everything is clean, we'll walk you through the completed work. We'll show you what was done, point out any special features, and answer any questions. You'll receive warranty information and documentation.
Then we're gone. You've got a new roof that should serve you well for the next 25-50 years depending on materials.

Final Thoughts
A roof replacement is a major home project, but it's also a well-established process. Experienced roofing crews do this every day. What seems chaotic from the outside is actually organized and methodical.
The key to a stress-free experience is knowing what to expect. You're not caught off guard by the noise, the mess, or the timeline. You know what's happening at each stage and why.
If you're planning a roof replacement with Fullstack Roofing, we'll walk you through everything specific to your project. Every roof is a little different, and we'll make sure you're prepared for your particular situation.
Have questions about the process? Want to schedule a consultation? Give us a call. We're happy to explain exactly what your roof project will look like.
Frequently Asked Questions
Quick answers to common questions about what to expect during your roof installation: complete homeowner guide
Should I be home during my roof installation?
You don't need to be home the entire time, but it helps to be reachable by phone. We recommend leaving during the noisy tear-off phase (usually morning) if possible. Be available for a final walkthrough when work is complete.
Will the roofing crew need to come inside my house?
Usually not. We work entirely from outside. The only exceptions are if we need attic access to check ventilation or if you have interior concerns to show us. We'll coordinate this with you in advance.
How do I protect my belongings during roof installation?
Move vehicles away from the house, clear patio furniture and grills, and take down hanging pictures inside. Cover attic items near the roof deck with plastic. We'll provide a detailed prep checklist before your installation date.
What happens if it starts raining during installation?
If we're mid-installation and rain threatens, we'll secure the roof with tarps to protect your home. We monitor weather carefully and avoid starting work when significant rain is expected. Brief delays for Utah summer storms are usually minimal.
How will I know the job is done correctly?
We perform a thorough final inspection before cleanup and then walk you through the completed work. You'll receive warranty documentation for materials and labor. We stand behind our work and address any concerns immediately.
Ready to Work with Utah's Best Roofers?
Get a free, no-obligation quote from Fullstack Roofing. We serve homeowners and businesses throughout Utah with expert roofing solutions.

Fullstack Roofing Team
Utah Roofing Experts
With over 15 years of experience in roofing across Utah, our team at Fullstack Roofing has helped thousands of homeowners protect their homes. We're passionate about providing accurate, helpful information to make your roofing decisions easier and your home safer.
Explore More With Fullstack Roofing
Calculators
Related Articles
Continue reading with these related articles about roofing and home improvement.
How Long Does a Roof Replacement Take in Utah? Timeline Guide
Wondering how long you'll be living under a torn-up roof? Here's what to actually expect from a roof replacement project in Utah.
Best Roofing Materials for Utah Climate 2025: Expert Recommendations
Utah's extreme weather demands the right roofing material. Here's what actually works best after 15+ years of installing roofs across the Wasatch Front.
Asphalt Shingles vs Metal Roofing in Utah: Complete Comparison Guide
Torn between asphalt and metal for your Utah roof? Here's an honest comparison from someone who installs both every week.
Utah Roof Maintenance Checklist: Seasonal Guide for Homeowners
A little maintenance goes a long way. Here's exactly what Utah homeowners should check each season to keep their roofs in top shape.
Signs Your Roof Needs Maintenance Before It's Too Late
Your roof is trying to tell you something. Here are the warning signs that mean it's time to call a roofer—before small problems become expensive disasters.
Utah Roof Insurance Claims: Complete Guide to Storm Damage Coverage
Filing a roof insurance claim in Utah doesn't have to be overwhelming. Here's everything you need to know to get your storm damage covered.